SATISFACTORYBASE

Satisfactory Bauxite Locations & Map

Find Bauxite nodes by purity and map region. Calculate extraction potential and open each location on the interactive Satisfactory map.

Default world resource layout. Satisfactory 1.2 randomization and purity settings can change the resources at these locations. Map links here explicitly open the default layout.

Extraction potential

Rates use miner speed, node purity and clock speed from the game-data model. Totals assume every listed node is mined; belt limits and local factory demand are not applied.

PurityNodesPer nodeTotal
Impure5120/min600/min
Normal6240/min1 440/min
Pure6480/min2 880/min

Total extraction potential: 4 920/min

Node locations (17)

Regions use the planning map’s approximate polygons. Coordinates are in metres (X, Y); they locate deposits, not paths or cave entrances.

Map regionPurityCoordinates (m)Map
SwampNormal2 631.48, 536.11Show node: Swamp
SwampImpure2 611.28, 482.75Show node: Swamp
SwampPure2 602.99, 562.28Show node: Swamp
SwampNormal1 990.07, 891.73Show node: Swamp
SwampImpure1 989.36, 933.54Show node: Swamp
Red Bamboo FieldsPure-593.22, 145.95Show node: Red Bamboo Fields
Red Bamboo FieldsNormal25.71, 98.34Show node: Red Bamboo Fields
Red Bamboo FieldsNormal394.78, 521.2Show node: Red Bamboo Fields
Red Bamboo FieldsImpure-56.34, 442.74Show node: Red Bamboo Fields
Red Bamboo FieldsPure-52.93, 920.75Show node: Red Bamboo Fields
Rocky DesertPure-2 170.52, 112.42Show node: Rocky Desert
Red JunglePure-1 773.67, 449.99Show node: Red Jungle
Red JungleNormal-1 505.75, -0.23Show node: Red Jungle
Titan ForestNormal1 060.48, 504.79Show node: Titan Forest
Titan ForestPure1 168.78, 515.11Show node: Titan Forest
Titan ForestImpure1 033.18, 674.99Show node: Titan Forest
Eastern Dune ForestImpure895.93, 626.39Show node: Eastern Dune Forest

Plan aluminum production

Bauxite is one input to an aluminum chain. Use the production calculator to account for the selected recipes and imported supplies. Its steady-state water balance does not simulate pipe startup or flow behavior.